Archive documents
Brickwork: Cost and details
Document Type
- Letter
Date
1929-11
Related building(s)
Design phase
- Construction
Image file(s)
- 22.11.1929_Brickwork_Extra Costs to avoid a fight_01.jpegjpg
- 22.11.1929_Brickwork_Extra Costs to avoid a fight_02.jpegjpg
- 26.11.1929_Brickwork_Cost.jpegjpg
- 26.11.1929_Brickwork_Cost.jpegjpg
- 26.11.1929_Brickwork_Extra cost for patterned masonry.jpegjpg
- 26.11.1929_Brickwork_Blakstad and Munthe-Kaas.jpegjpg
- 4.12.1929_Brickwork_Extra Cost.jpegjpg